110 kV flat stone (three East) power transmission project (without communication)

1. Bidding conditions The tendering project of 110 kV flat stone (Sandong) power transmission and transformation project (excluding communication) [construction tender] has been approved by the Guangdong Provincial Development and Reform Commission with the approval of the Guangzhou Municipal Development and Reform Commission on the approval of 110 kV flat rock ( "Sandong) Approval of Power Transmission and Transformation Project" (No. 463 of Sui Fachang [2016]) was approved for construction. The project construction unit is Guangzhou Power Supply Bureau Co., Ltd. The construction fund is self-owned funds and bank loans. The bidder is Guangzhou Power Supply Bureau Co., Ltd. . The project has already met the conditions for bidding. The project is now undergoing open bidding. 2. Project Overview and Bidding Scope 2.1 Construction Site: Guangzhou, Guangdong Province 2.2 Construction Scale: 1.110 kV Pingshi (Three East) Power Transmission and Transformation Project (Substation)

In the current period, there were two 63 MW volt main transformers, two 110 VDC outgoing lines, and 32 radiated 10-kilovolt lines; three 63 mega volt main transformers in the final stage, three 3-circuit lines for 110-kilovolt lines and 48 lines for 10-kilovolt lines. Two sets of 6-million-star low-voltage shunt capacitors are installed on the 10 kV side of each main transformer.
2.110 kV flat stone (three East) power transmission project (cable section)
The newly-built line will be designed with double-backed trenches (six rounds of cable trenches, with two loops and four trips reserved in this period). The new double-circuit cable line will be approximately 2*0.15km (including the length of cable within Pingshi Station 2*0.1km). ), New cable conductor cross-section is 1200mm. (For details, see the tender documents and design drawings). 2.3 Plan duration: 397 calendar days, planned start date: March 30, 2017, planned completion date: April 30, 2018 (Specific start report, completion report shall prevail). 2.4 Bidding scope: Construction, installation and commissioning works within the scope of construction drawings and all the work required for completing the project specified in the bidding documents. (For details, see the tender documents). 2.5 Benchmarking: The bidding of this project is divided into 1 bid section and 1 bid winner. (For details on the division of tenders, see the tender documents). 3. Qualification of bidders 3.1 Qualification of general contracting of power engineering construction at level 3 and above, or qualification of professional contractor of power transmission and transformation project at level 3 and above; 3.2 Qualification of “installation (repair, test) power facility permit” Level 3 and above licenses and class 3 and above permits. 3.3 Has an independent legal personality, holds a valid and valid business license for a corporate legal person, and constructs a safe production license issued by an administrative department in charge; 3.4 The project manager must register a professional architect for grade 2 or above of a mechanical and electrical engineering major, and also holds a project manager for safe production. Appraisal Certificate (B); Note: According to the “Notice on the Issues Concerning the Confirmation of Secondary Construction Engineers' Registration and Practice in Guangdong Province Outside Guangdong Province” (Guangdong Construction Letter [2011] No. 218), according to the Guangdong Provincial Department of Housing and Urban-Rural Development The qualification certificate and registration certificate of the qualified constructor of the constructor are only valid in the administrative area where it is located, and shall not be practiced across provinces. 3.5 The government of the project and China Southern Power Grid Co., Ltd. shall not be subject to restricted bids; 3.6 IC card has been processed in Guangzhou. The project manager intending to serve as this project must be a registered person in the company (IC card); potential bidders who have not purchased the bidding documents shall not participate in the bidding; 3.7 This project does not accept the consortium bid. 4. Bidding Registration and Bidding Document Acquisition 4.1 Any interested bidder is invited to participate in the bid from December 30, 2016 to January 6, 2017 (except holidays), from 9:30 a.m. to 11:00 a.m., in the afternoon. From 2:00 to 4:00 (Beijing time, the same below)

Folding Solar Panels 180w

Portable Solar Panels,180W Folding Solar Panel,180W Folding Panel,180W Camping Solar Panels

Zhejiang G&P New Energy Technology Co.,Ltd , https://www.solarpanelgp.com

This entry was posted in on